Flood Response
More Than a Flood Wall: Protecting Critical Sewer Infrastructure
During a flood, CCWMA has an important operational role in helping protect Bloomsburg’s sewer system and wastewater treatment plant.
01
Close the Main Sewer Line
Under flood-response procedures, the main sewer line would be closed to isolate the normal route.
02
Activate Auxiliary Sewer Lines
CCWMA-operated auxiliary sewer lines would be brought into service to maintain sewer flow during flood conditions.
03
Run Pumps & Generators
CCWMA would activate pumps and generators to help manage sewer flow, prevent sewage from discharging into the river, and reduce the risk of floodwater overwhelming the wastewater treatment plant.
Why this matters to residents
The flood protection system involves more than the visible wall. It also requires reliable equipment, trained operational readiness, inspections, preventive maintenance and emergency reserves so critical infrastructure can function when a flood occurs.
This is a simplified description of the planned flood-response procedure, not a guarantee against sewage releases, flooding or treatment plant disruptions.